Our commissioning services are:
- HVAC and utilities adjusting, testing and balancing
- Air cleanliness classification in cleanrooms
- Cleanrooms and associates construction check up
The purpose of this activity is to check in execution and post execution time the compliance with the project (proper installation and functioning of assemblies), having as result the removal of faults.
Based on the diagram shown below, commissioning team is always connected with the Owner, Projection Team, Construction Team during the project.


Commissioning Phases:
- Project Phase: Commissioning Plan elaboration and test preparations.
- Construction Phase: On site pursuance of construction phases and their impact with the Commissioning Plan.
- Acceptance Phase:
- Elaboration of installation and operation tests
- Elaboration of the protocols
- The system capacity to maintain the required parameters in the clean rooms and annexes checking up
- Post Acceptance Phase: After the faults are removed the tests which didn’t comply with the acceptance criteria are repeted.